Sunday, April 15, 2007

Slab Happy

More time spent on the new greenhouse - most of which was spent getting the paving slabs level and bolting the greenhouse base to them. Not as easy as we expected, with a high risk of the slabs breaking in half as they're drilled. Holes were drilled in the greenhouse base, where thick screws were used to bolt it to the slabs. Unfortunately there were not enough slabs to cover the whole floor surface, or even to go around it, so we'll need to think of a way of filling the gaps.

Fixing the base to the slabs

0 comments: